Own-factory outerwear manufacturing
OEM outerwear,
made for your brand.
Develop technical jackets with our own apparel factory in Ningbo. Bring a tech pack or start from an existing style.
- Apparel MOQ
- 300 pieces
- Sample lead time
- 15 days
- Bulk lead time
- 30–45 days
Material availability, color allocation and schedule start dates are confirmed in your quotation.
How we work
A clear starting point.
Two ways to develop.
OEM / private label
Your tech pack, measurements and artwork. We review materials, construction and production requirements against your brief.
Development from a reference
Start with an existing style and your target use. Agree changes to fit, fabric and details before sampling.
From your brief to approved production.
A straightforward development process, with the specification agreed before bulk production.
Brief review
Style, target market, quantity and timing.
Materials
Fabric, trims and construction options.
Sampling & fit
Measurements, sample review and revisions.
Approval
Agreed sample, artwork and written specification.
Production & inspection
Written quality criteria and packing checks.
The approved sample and written specification guide the production order.
Specification details
Specify the details
that matter.
- Fabric & membrane
- Composition, weight, layer structure and agreed performance targets.
- Fit & construction
- Measurements, layering allowance, seams and pocket layout.
- Trims & branding
- Zips, labels, artwork and packaging.
- Testing & inspection
- Methods, required documents and acceptance criteria for your order.
Built around technical outerwear.
What should I send for a quotation?
Send a tech pack or style reference, quantity, target market, size and color split, and the performance requirements that matter to your project. Include your preferred delivery timing.
Can I customize fabric, fit and branding?
Yes. We review fabric options, measurements, pocket layouts, trims, labels, artwork and packaging against your brief. Feasibility, development scope and costs are agreed before sampling.
How are testing requirements confirmed?
Agree the test methods, required documents and acceptance criteria for the selected product and destination market. Performance claims must be supported by relevant material or garment evidence.
Do the same terms apply to outdoor gear?
The 300-piece MOQ, 15-day sample lead time and 30–45-day bulk lead time are our apparel planning baseline. Outdoor equipment is sourced through partner suppliers and quoted separately. Explore gear sourcing ↗
Tell us about your next jacket.
Share your style, quantity and target market. We will review the development route with you.